We received a callback from the draftsman today after an unsuccessful attempt to contact him the previous evening regarding a site visit to BN008 for the toilet plan drawings. The draftsman confirmed that he was available to visit the site this morning.
Upon reaching out to BN008 to coordinate, they informed us that, as it was Sunday, they would be attending church in the morning. We advised BN008 to contact the draftsman directly to arrange a mutually convenient time for the visit.
We look forward to ensuring that the site visit takes place soon, allowing the necessary plans to be finalized for the building application process.
No comments:
Post a Comment